MODELING AND IDENTIFICATION OF WELL NO. 3 DEVIATION OF NOVOMYKHAILIVSKA SUITE

Authors

  • М. В. Шавранський ІФНТУНГ, 76019, м.Івано-Франківськ, вул. Карпатська, 15, тел. (0342) 504521
  • О. В. Кучмистенко ІФНТУНГ, 76019, м.Івано-Франківськ, вул. Карпатська, 15, тел. (0342) 504521
  • В. І. Олійник ІФНТУНГ, 76019, м.Івано-Франківськ, вул. Карпатська, 15, тел. (0342) 504521

Keywords:

deviation, model, chatacteristic, identification, well, control system, drilling, parameters.

Abstract

Theoretical description of developing different mathematical models and their identification in accordance with the experimental data was provided. On the basis of the experimental data from the well No. 3 of Novomykhailivska
suite actual models of the well deviation were developed and, in particular, they include: correlation, spectral, and eight parametric models. Their identification was also conducted. According to the numerical estimations
of the root-mean-square error of the managing decisions, the optimum arx 321 type model was identified. Different chatacteristics were made on the basis of the developed models: transitional, impulse, frequency and
spectral in the Matlab software environment..

References

1 Семенцов Г.Н. Автоматизація процесу буріння свердловин: [навчальний посібник]; ч. 3. – Івано-Франківськ: Факел, 1998. – 191 с.
2 Hazard Identification and Risk Assessment of Skin & Eye Irritation in a Manufacturing Indusrtry in the Philippines: Continuing Study JL Lu. – Dehradun, 2007-2009.
3 Cantero, J.L.; Tardio, M.M.; Canteli, J.A.; Marcos, M.; Miguelez, M.H. (2005) Dry drilling of alloy Ti-6Al-4V. International Journal of Machine Tools and Manufacture, 45 (11): 1246- 1255.
4 Kim, D.; Ramulu, M. (2004) Drilling process optimization for graphite/bismaleimide-titanium alloys stacks. Composite Structures, 63 (1): 101- 114.
5 Dornfeld, D.A.; Kim, J.S.; Dechow, H.; Hewson, J.; Chen, L.J. (1999) Drilling burr formation in titanium alloy, Ti-6Al-4V. CIRP Annals, 48 (1): 73-76.
6 Леоненков А.В. Нечеткое моделирование в среде MATLAB и fuzzyTECH / А.В.Леоненков. – СПб.: БХВ-Петербург, 2003. – 736 с.
7 Шавранський М.В. Фаззі-моделювання для прогнозування прихоплень колони бурильних труб / М.В.Шавранський // Науковий вісник ІФНТУНГ. – 2001. – № 1. – С. 87 - 90.

Published

17.09.2014

How to Cite

Шавранський, М. В., Кучмистенко, О. В., & Олійник, В. І. (2014). MODELING AND IDENTIFICATION OF WELL NO. 3 DEVIATION OF NOVOMYKHAILIVSKA SUITE. Oil and Gas Power Engineering, (2(22), 7–13. Retrieved from https://nge.nung.edu.ua/index.php/nge/article/view/312

Issue

Section

PHYSICAL-TECHNICAL PROBLEMS OF ENERGY CARRIERS RECOVERY

Most read articles by the same author(s)