Витязь, О. Ю., Грабовський, Р. С. and Тирлич, В. В. (2017) “IMPACT OF OPERATION TIME ON THE ASSESSMENT OF CONDITIONS OF DRILL PIPES FAILURE DURING TRIPPING”, Oil and Gas Power Engineering, (1(27), pp. 7–14. Available at: https://nge.nung.edu.ua/index.php/nge/article/view/397 (Accessed: 30 April 2024).