ВИТЯЗЬ, О. Ю.; ГРАБОВСЬКИЙ, Р. С.; ТИРЛИЧ, В. В. IMPACT OF OPERATION TIME ON THE ASSESSMENT OF CONDITIONS OF DRILL PIPES FAILURE DURING TRIPPING. Oil and Gas Power Engineering, [S. l.], n. 1(27), p. 7–14, 2017. Disponível em: https://nge.nung.edu.ua/index.php/nge/article/view/397. Acesso em: 4 dec. 2024.