Slot Gacor
TY - JOUR AU - Дзьоба, О. Г. AU - Джус, А. П. PY - 2012/05/17 Y2 - 2024/03/29 TI - OPTIMIZATION OF SOLUTIONS DURING THE DESIGN PROCESS OF ONSHORE TERMINALS FOR GAS TRANSPORTATION BY CNG TECHNOLOGY JF - Oil and Gas Power Engineering JA - ogpe VL - IS - 1(17) SE - PHYSICAL AND TECHNICAL PROBLEMS OF ENERGY CARRIERS TRANSPORTATION STORAGE DO - UR - https://nge.nung.edu.ua/index.php/nge/article/view/36 SP - 41-49 AB - <p><em>Considerations of onshore terminals for transporting of compressed gas through marine areas using special</em> <em>gas carriers are considered. The main factors which determine the economic and technological parameters of onshore</em> <em>terminals and affect both the selection and arrangement of compressor equipment, and the selection of operational</em> <em>parameters during operations such as loading and unloading are defined. Rational sequence and stages of</em> <em>loading and unloading operations depending on the pressure in the pipeline terrestrial networks, parameters of gas</em> <em>carriers, productivity of onshore compressor equipment, time constraints are proved.</em></p><p><em>Possible options of layout onshore terminals by basic technological equipment in a wide performance range of</em> <em>gas transportation route with requirements of reliability and efficiency were proposed.</em></p><p><em>The structure of the investment and operating costs in the construction and operation of gas transmission infrastructure</em> <em>based on CNG technologies were analyzed and features of its replacement depending on the length of</em> <em>the route was determined.</em></p><p><em>&nbsp;</em></p> ER -